Quick answers
What is this project?
Proposed "Ordinary Soil Mining" Project at Gata No.- 172,175, Village-Madaura, Tehsil-Goverdhan, District- Mathura, Uttar Pradesh (Area-2.606 Ha), Shri Kuldeep Thakur S/O Shri Mohan Shayam is a proposed mining project in Maraura, Mathura, Uttar Pradesh. The site covers 6.4 acres.
Who is building it?
The applicant is Kuladeep Thakur.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Maraura, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹13 lakh and a site of 6.4 acres.
When was it filed?
The application was filed on 19 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 14 Nov 2026 |
| Application filed | 19 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kuladeep Thakur |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Maraura |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05025 |
In context
28 applications in Mathura since January 2022 are in the same category (Mining): 10 approved, 18 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.4 acres, this one is larger than 57% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Maraura, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining" Project at Gata No.- 401,406, Village-Madaura,… — initial checks, 1.6 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 448, Village-Madaura,… — initial checks, 1.9 km away
- "Ordinary Soil Mining" Project at Gata No.- 454, 455, 461, Village-Malsarai,… — under environmental review, 4.5 km away
- The diversion of road side Protected Forest Land for the construction of a… — lapsed, 6.1 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 145/2, Village-Dahrauli,… — initial checks, 7.7 km away
- Proposed Group Housing Project (Shri Divine Vedaa) on Khasra No. 588 — environmental approval granted, 9.4 km away
- Widening and Strengthing Work of Kosi-Nandgown-Barshana-Goverdhan-Sonkh-Mathura… — under forest review, 11.5 km away
- Kirtan Bihari Temple — lapsed, 12.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.