Project details
| Official title | Establishment of New Natural and Synthetic Chemical Manufacturing Unit by M/s Detergeo Chem Private Limited (DCPL) |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 May 2026 |
| Application filed | 14 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Detergeo Chem Private Limited |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹20 crore |
| Village / locality | Bhojaheri |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05037 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Feb 2026 (this page) | Environmental approval granted | 3.1 acres | ₹20 crore |
| Early planning filed 8 Apr 2025 | Cleared for impact study | 3.1 acres | ₹20 crore |
In context
47 applications in Muzaffarnagar since January 2022 are in the same category (Industry): 30 approved, 5 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.1 acres, this one is smaller than 83% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhojaheri, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Natural and Synthetic Chemical Manufacturing Unit by M/s Detergeo Chem… — cleared for impact study, 0 m away
- Amended Bharat Net — lapsed, 1 km away
- Proposed 4-Lane widening of the Delhi-Nitipas Road (PURKAZI DIVISION NH-58)… — forest land use approved, 1 km away
- Diversion of Pf Land in Favour of Vedanta Infra Build, Muzaffarnagar for… — lapsed, 2.9 km away
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved, 3.1 km away
- 0.2017 Ha PF land Proposed to Transfer for approach and exit road for Proposed… — forest land use approved, 3.3 km away
- Proposed expansion of Existing Sugar Unit from 4500 TCD to 7000 TCD — environmental approval granted, 3.4 km away
- Distillery having capacity 300 KLD (Cane Juice Syrup/ C or B - Heavy Molasses… — environmental approval granted, 3.7 km away
All 3 Detergeo Chem projects across India