Project details
| Official title | Proposal of Diversion of Reserve Forest Land for Construction of Overhead Water Tanks and Comprising of Tube Well Pressure Mains, Ohsr, Distribution Pipe Networks in Reserve Forest Block Akbarpur Icchabad -Hastinapur Range , Reserve Forest Block Mahmudabad, Reserve Forest Block Khanpur Garhi, Reserve Forest Block Mishripur, Reserve Forest Block Tarbiyatpur Janubi-Parikshitgarh Range in Tehsil-Mawana ,district/Forest Division-Meerut (Uttar Pradesh) Under Rural Drinking Water Supply Sch |
|---|---|
| Status | More information requested |
| Status since | 9 Aug 2024 |
| Application filed | 20 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer ,uttar Pradesh Jal Nigam (Rural),meerut |
| Land area | 7.9 acres (3.2 ha) |
| Forest land | 3,900 m² |
| Project cost | ₹11 crore |
| Village / locality | Tarbiat Pur Janubi |
| Taluk / tehsil | Mawana |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05057 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Dec 2023 (this page) | More information requested | 7.9 acres | ₹11 crore |
| New project filed 19 Nov 2023 | More information requested | 7.9 acres | ₹11 crore |
In context
5 applications in Meerut since January 2022 are in the same category (Water & irrigation): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Tarbiat Pur Janubi, Mawana, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of Diversion of Reserve Forest Land for Construction of Overhead… — more information requested, 0 m away
- Regarding Obtaining No Objection Certificate From The Forest Department For… — more information requested, 8.1 km away
- Project for Wildlife Clearence in Sbwl/Nbwl :- Construction of Overhead Water… — under wildlife review, 12.1 km away
- 220 KV D/C Meerut(765)- Mawana Line — in-principle approval, conditions pending, 13.9 km away
- Kaushal Narayan Agro Products — lapsed, 15 km away
- Amended Bharatnet Project — lapsed, 15.4 km away
- Project for Wildlife Clearence in Sbwl/Nbwl :- Construction of Overhead Water… — more information requested, 16 km away
- Distribution Pipe Networks — more information requested, 16 km away
More from Executive Engineer ,uttar Pradesh Jal Nigam (Rural),meerut in Meerut
- Distribution Pipe Networks — more information requested
All 3 Executive Engineer ,uttar Pradesh Jal Nigam (Rural),meerut projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.