Project details
| Status | Forest land use approved |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Adani Hydro Energy Six Limited |
| Land area | 4,392.9 acres (1,777.7 ha) |
| Forest land | 1,083.8 acres (438.6 ha) |
| Project cost | ₹5,690.9 crore |
| Village / locality | Badarwa |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05094 |
In context
7 applications in Sonbhadra since January 2022 are in the same category (Other): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badarwa, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Cherue Pumped Storage Project (1200 MW) — cleared for impact study, 0 m away
- Permission for Drilling of Boreholes in Churk Range under Sonbhadra Forest… — forest land use approved, 2 km away
- Sonbhadra Off-Stream Closed Loop Pumped Storage Project — cleared for impact study, 2.7 km away
- Sashnai Pumped Storage Project (1760 MW) — cleared for impact study, 6.7 km away
- Sashnai Pumped Storage Project (1760 MW) — cleared for impact study, 6.7 km away
- Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six… — cleared for impact study, 6.8 km away
- Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six… — cleared for impact study, 6.8 km away
- Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six… — under environmental review, 6.9 km away
More from Adani Hydro Energy Six Limited in Sonbhadra
- Cherue Pumped Storage Project (1200 MW) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.