Quick answers
What is this project?
The diversion of Protected Forest Land for the construction of the Approach Road infrastructure (Entry/Exit, Acceleration/Deceleration Lanes, Separator, Chevron Marking, and Earthen Shoulders) to the New Retail Outlet at Agra-Bah-Kachora Ghat Road (SH-62), Km Stone No- 40, Chainage No- 39.147, Khasra No- 775, Village- Khander, Tehsil- Fatehabad, and District- Agra (U.P.) by HPCL is a proposed fuel station in Khander, Fatehabad, Agra, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khander, Fatehabad, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 1.1 acres and 2,300 m² of forest land.
When was it filed?
The application was filed on 28 Aug 2026.
Project details
| Official title | Proposal for the diversion of Protected Forest Land for the construction of the Approach Road infrastructure (Entry/Exit, Acceleration/Deceleration Lanes, Separator, Chevron Marking, and Earthen Shoulders) to the New Retail Outlet at Agra-Bah-Kachora Ghat Road (SH-62), Km Stone No- 40, Chainage No- 39.147, Khasra No- 775, Village- Khander, Tehsil- Fatehabad, and District- Agra (U.P.) |
|---|---|
| Status | More information requested |
| Status since | 13 Oct 2026 |
| Application filed | 28 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 2,300 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Khander |
| Taluk / tehsil | Fatehabad |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05196 |
In context
33 applications in Agra since January 2022 are in the same category (Fuel stations): 19 approved, 5 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is larger than 52% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khander, Fatehabad, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Utangan River Side Protected Forest Land for the Construction… — lapsed, 4.2 km away
- Domestice Water Pipe Line Under Namami Gange Scheme — more information requested, 5.1 km away
- Review of Survey, Design, Drawings, DPR and Construction of Agra Package –II… — more information requested, 5.1 km away
- Domestice Water Pipe Line Under Namami Gange Scheme — more information requested, 5.1 km away
- Multi Group of Village Surface Source Water Supply Scheme Agra Package -1 — under forest review, 5.6 km away
- Amended BharatNet Project (Pinahat-Agra) — lapsed, 6.9 km away
- Proposed Fuel station of M/S BP Mobility Limited — in-principle approval, conditions pending, 12.4 km away
- Project for Laying of underground Optical Fiber Cable (OFC) — lapsed, 13.1 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Agra
- Proposal Under the Forest (Conservation and Augmentation) Act, 1980, for… — forest land use approved
6 Hindustan Petroleum Corporation (HPCL) projects in Agra
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.