Quick answers
What is this project?
Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line from Km. 95+200 to Km. 117+550 (22350m), Km. 127+970 to Km. 128+720 (750m) LHS & Km. 97+870 to 103+570 (5700m), Km. 117+550 to Km. 130+200 (12650) RHS on Delhi-Moradabad Road, NH-09 is a proposed pipeline project in Alipur Bhur, Dhanaura, Amroha, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Megha City Gas Distribution Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Alipur Bhur, Dhanaura, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore; a site of 3.1 acres and 3.1 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 26 Aug 2026.
Project details
| Official title | Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line from Km. 95+200 to Km. 117+550 (22350m), Km. 127+970 to Km. 128+720 (750m) LHS & Km. 97+870 to 103+570 (5700m), Km. 117+550 to Km. 130+200 (12650) RHS on Delhi-Moradabad Road, NH-09 at District-Amroha, U.P. |
|---|---|
| Status | More information requested |
| Status since | 16 Oct 2026 |
| Application filed | 26 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Megha City Gas Distribution Private Limited |
| Land area | 3.1 acres (1.3 ha) |
| Forest land | 3.1 acres (1.2 ha) |
| Project cost | ₹2 crore |
| Village / locality | Alipur Bhur |
| Taluk / tehsil | Dhanaura |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05205 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alipur Bhur, Dhanaura, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line… — under wildlife review, 0 m away
- Ordinary Soil Mine — environmental approval granted, 4.9 km away
- Diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 5.4 km away
- Diversion of Protected Forest Land for Construction of Approach Road to the… — forest land use approved, 5.4 km away
- Proposed Protected Forest Land To Be Diverted For Construction Work Of… — in-principle approval, conditions pending, 5.6 km away
- Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) with… — environmental approval granted, 6 km away
- Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) with… — returned to applicant, 6 km away
- Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) with… — cleared for impact study, 6 km away
More from Megha City Gas Distribution Private Limited in Amroha
- Proposed Forest Land to be diverted for Laying Natural Gas 8" CS Pipe line… — under wildlife review
- Proposed Forest Land to be diverted for Entry/Exit Approach to MCGDPL CNG… — forest land use approved
All 3 Megha City Gas Distribution projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.