Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to Reliance BP Mobility Limited Retail Outlet is an approved fuel station in Sonughat, Deoria, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Reliance Bp Mobility Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Dec 2025), as of 27 Nov 2026.
Where is it?
In Sonughat, Deoria, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh; a site of 1.6 acres and 3,620 m² of forest land.
When was it filed?
The application was filed on 27 Oct 2024.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to Reliance BP Mobility Limited Retail Outlet at Village: -Sonughat, Tehsil:- Deoria, District:- Deoria. |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Dec 2025 |
| Application filed | 27 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliance Bp Mobility Limited |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 3,620 m² |
| Project cost | ₹70 lakh |
| Village / locality | Sonughat |
| Taluk / tehsil | Deoria |
| District | Deoria |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05210 |
In context
18 applications in Deoria since January 2022 are in the same category (Fuel stations): 7 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.6 acres, this one is larger than 94% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sonughat, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.3355 Hectare Protected Forest land under social forestry… — lapsed, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy… — lapsed, 650 m away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit of Indian Oil… — lapsed, 1.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed, 4 km away
- Deoria Bypass From Existing Km. 27.140 to Existing Km. 46.780 (Design Km.… — more information requested, 7.4 km away
- Laying of CS Natural Gas pipeline with OFC duct along Gorakhpur Deoria Road… — under forest review, 8.7 km away
- Proposed expansion of existing Distillery from 200 KLD (Molasses or Cane juice… — lapsed, 9.9 km away
- Expansion of Existing Distillery From 100 Kld (Molasses/ Cane Juice… — environmental approval granted, 9.9 km away
More from Reliance Bp Mobility Limited in Deoria
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — more information requested
3 Reliance Bp Mobility projects in Deoria
All 153 Reliance Bp Mobility projects across India