Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Village:-Suparaja, Tehsil:-Bansi, District:- Siddharth Nagar. |
|---|---|
| Status | Forest land use approved |
| Status since | 12 Mar 2025 |
| Application filed | 29 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,000 m² |
| Forest land | 1,790 m² |
| Project cost | ₹55 lakh |
| Village / locality | Supa Raja |
| Taluk / tehsil | Bansi |
| District | Siddharthnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05215 |
In context
11 applications in Siddharthnagar since January 2022 are in the same category (Fuel stations): 6 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.7 acres, this one is smaller than 82% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Supa Raja, Bansi, Siddharthnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP… — under forest review, 800 m away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested, 2.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 3.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 10.5 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 10.5 km away
- Improvement and Up-gradation to two Lane with Paved Shoulder configuration… — lapsed, 11.7 km away
- Improvement and Up-gradation to two Lane with Paved Shoulder configuration… — forest land use approved, 11.7 km away
- Proposed IOCL Retail Outlet at Kakrahwa-Basti Road NH-28 (New NH-233),… — under forest review, 15.9 km away
More from Indian Oil Corporation Limited (IOCL) in Siddharthnagar
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
4 Indian Oil Corporation (IOCL) projects in Siddharthnagar
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.