Quick answers
What is Mathura Group of Village Water Supply Scheme I?
Mathura Group of Village Water Supply Scheme I is a lapsed water and irrigation project in Lohagar, Khair, Aligarh, Uttar Pradesh. The site covers 56.2 acres.
Who is building it?
The applicant is Uttar Pradesh Jal Nigam Rural.
Has it been approved?
No. The application was lapsed on 4 Aug 2025, so it is no longer under consideration.
Where is it?
In Lohagar, Khair, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,080.5 crore; a site of 56.2 acres and 4,000 m² of forest land.
When was it filed?
The application was filed on 10 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mathura Group of Village Water Supply Scheme I
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Aug 2025 |
| Application filed | 10 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Uttar Pradesh Jal Nigam Rural |
| Land area | 56.2 acres (22.8 ha) |
| Forest land | 4,000 m² |
| Project cost | ₹1,080.5 crore |
| Village / locality | Lohagar |
| Taluk / tehsil | Khair |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05302 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Apr 2026 | More information requested | 56.2 acres | ₹1,080.5 crore |
| New project filed 10 Sept 2024 (this page) | Lapsed | 56.2 acres | ₹1,080.5 crore |
Where it is
Lohagar, Khair, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mathura Group of Village Water Supply Scheme I — more information requested, 0 m away
- Amended BharatNet Project (Chandaus-Aligarh) — lapsed, 6.3 km away
- Amended BharatNet Project (Khair-Aligarh) — lapsed, 8.3 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 8.6 km away
- Environmental Clearance of proposed production of 3,75,000 TPA Steel Billets… — environmental approval granted, 8.7 km away
- Diversion of 0.1654 Hectare of protected Forest land under social forestry… — forest land use approved, 9.2 km away
- Diversion of protected forest land for Construction of approach road to the… — in-principle approval, conditions pending, 10 km away
- "Proposed Industrial Building" — environmental approval granted, 10.5 km away
All 3 Uttar Pradesh Jal Nigam Rural projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.