Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 29 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Rahul Pal |
| Land area | 300 m² |
| Forest land | 50 m² |
| Project cost | ₹1.7 crore |
| Village / locality | Muhammadpur Bastur |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05411 |
In context
13 applications in Moradabad since January 2022 are in the same category (Other): 0 approved, 2 filed or under review, and 11 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 83% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muhammadpur Bastur, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to Diesel… — lapsed, 1.1 km away
- Proposed Forest Land to Be Diverted for Entry/Exit Approach to Property of… — lapsed, 1.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — under forest review, 1.8 km away
- ''Ordinary Soil Mining Project" at Gata No.– 464, 479, Village- Birpur,… — environmental approval granted, 2.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2.9 km away
- ''Ordinary Soil Mining Project" at Gata No.- 66, 167, 171, 184, Village-… — environmental approval granted, 3.8 km away
- Ashish Sharma — lapsed, 4.1 km away
- Dr Syed Asmat Ali S/O Syed Ishrat Ali — lapsed, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.