One of 3 filings for this project. The project's main page, with every filing and where each stands: Jhariya Pumped Storage Project
Project details
| Status | Under forest review |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 13 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jhariya Ananturja Private Limited |
| Land area | 766.3 acres (310.1 ha) |
| Forest land | 619 acres (250.5 ha) |
| Project cost | ₹7,457.7 crore |
| Village / locality | Barahmori |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05452 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Sept 2026 (this page) | Under forest review | 766.3 acres | ₹7,457.7 crore |
| Amendment filed 9 Jan 2026 | Cleared for impact study | 1,288.6 acres | ₹7,457.7 crore |
| Early planning filed 2 Jul 2024 | Cleared for impact study | 1,288.6 acres | ₹7,457.7 crore |
In context
28 applications in Sonbhadra since January 2022 are in the same category (Water & irrigation): 14 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 766.3 acres, this one is smaller than 96% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barahmori, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jhariya Pumped Storage Project — cleared for impact study, 200 m away
- Jhariya Pumped Storage Project — cleared for impact study, 200 m away
- Preliminary exploration for glauconitic sandstone in Vindhyan Super group,… — forest land use approved, 2.9 km away
- Sashnai Pumped Storage Project (1760 MW) — cleared for impact study, 3.5 km away
- Sashnai Pumped Storage Project (1760 MW) — cleared for impact study, 3.5 km away
- Morrum Mining Project on Son River Bed — environmental approval granted, 4.6 km away
- Area- (18.214 Ha) For Son River Morrum Mining At Araji No.531 ङ Khand No.6… — environmental approval granted, 4.8 km away
- Morrum Mining Project at Gata No.- 531 Anga, Khand- 04 Area - 12.146 Ha.… — environmental approval granted, 5.4 km away
All 3 Jhariya Ananturja projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.