Quick answers
What is this project?
Diversion of Protected Forest Land for Construction of Approach Road to the Retail Outlet of Bharat Petroleum Corporation Limited Located on Aligarh-Ramghat Road (Mdr-105) Km 05 Chainage 4.594 (R.H.S.) on Khasra No. 383a, 383kh, Village-Quarsi, Tehsil-Koil, Disrict-Aligarh is an approved fuel station in Kwarsi, Koil, Aligarh, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Niranjan Kumar.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 3 Apr 2025), as of 27 Nov 2026.
Where is it?
In Kwarsi, Koil, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 0.2 acres and 240 m² of forest land.
When was it filed?
The application was filed on 15 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 3 Apr 2025 |
| Application filed | 15 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Niranjan Kumar |
| Land area | 900 m² |
| Forest land | 240 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Kwarsi |
| Taluk / tehsil | Koil |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05549 |
In context
25 applications in Aligarh since January 2022 are in the same category (Fuel stations): 14 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.2 acres, this one is smaller than 96% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kwarsi, Koil, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to Be Diverted by Hindustan Petroleum… — lapsed, 200 m away
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — more information requested, 2 km away
- Laying of Carbon Steel Gas Pipeline — forest land use approved, 3.5 km away
- Diversion of protected forest land for Construction of 640.61 m long Four-lane… — forest land use approved, 4.2 km away
- Rasik Greens — environmental approval granted, 4.6 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 4.6 km away
- Re-Diversion of Forest Land for Laying of Reliance Jio Optical Fibre Cable (Ofc) — lapsed, 4.6 km away
- Diversion of Protected Forest Land for Rehabilitation and up-gradation to… — lapsed, 4.8 km away
More from Niranjan Kumar in Aligarh
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.