What is this project?
Laying of OFC along with on Sultanpur Varanasi Marg (NH-731) from Km. 185.100 To Km. 185.500, Km. 194.400 To Km. 194.900, Km. 199.400 To Km. 210.680, Km. 213.800 To Km. 223.680 & Badlapur Bypass Marg From Km. 183.180 To Km. 190.580, Km. 190.580 To Km. 197.283, Karanpur Dhema Marg 0.6 Km., Nepedwa Market Lakhnipur Marg 2.9 Km. & Jaunpur Bypass Marg Km. 218.840 To Km. 222.040 & Prayagraj Gorakhpur Marg 0.3 Km. (On L.H.S.) Total KM 43.110 KM & 0.1927 Ha. In Jaunpur Forest Division, District-Jaunpur is a lapsed telecom project in Muhammid Pur English, Jaunpur, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Vindhya Telelinks Limited.
Has it been approved?
No. The application was lapsed on 15 Dec 2025, so it is no longer under consideration.
Where is it?
In Muhammid Pur English, Jaunpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹43 lakh; a site of 0.5 acres and 1,930 m² of forest land.
When was it filed?
The application was filed on 25 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Dec 2025 |
| Application filed | 25 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vindhya Telelinks Limited |
| Land area | 1,900 m² |
| Forest land | 1,930 m² |
| Project cost | ₹43 lakh |
| Village / locality | Muhammid Pur English |
| Taluk / tehsil | Jaunpur |
| District | Jaunpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05658 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muhammid Pur English, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion for Reliance 4G Project for Laying of OFC — lapsed, 3.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — under forest review, 8.2 km away
- Proposed forest land to be diverted for Construction of 2 Lane Railway Over… — forest land use approved, 8.4 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — forest land use approved, 10.2 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 10.2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 11.5 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 12.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 15 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.