What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Saharanpur, Uttar Pradesh

2 No Bridge and Approaches of 2 Lane Over River Mountain on Bhuradev Temple to Shakumbharidevi Temple

2 No Bridge and Approaches of 2 Lane Over River Mountain on Bhuradev Temple to Shakumbharidevi Temple is an approved road project in Barkala R F, Behat, Saharanpur, Uttar Pradesh. The site covers 2.4 acres. Its stated project cost is ₹46.8 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 10 Apr 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

2 No Bridge and Approaches of 2 Lane Over River Mountain on Bhuradev Temple to Shakumbharidevi Temple is an approved road project in Barkala R F, Behat, Saharanpur, Uttar Pradesh. The site covers 2.4 acres.

Who is building it?

The applicant is Up State Bridge Corporation Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 10 Apr 2026), as of 27 Nov 2026.

Where is it?

In Barkala R F, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹46.8 crore; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.

When was it filed?

The application was filed on 23 Jun 2024.

Project details

Official titleConstruction of 2 No Bridge and Approaches of 2 Lane Over River Mountain on Bhuradev Temple to Shakumbharidevi Temple in District Saharanpur
StatusForest land use approved
Status since10 Apr 2026
Application filed23 Jun 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantUp State Bridge Corporation Limited
Land area2.4 acres (1 ha)
Forest land2.4 acres (1 ha)
Project cost₹46.8 crore
Village / localityBarkala R F
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05776

In context

11 applications in Saharanpur since January 2022 are in the same category (Roads & highways): 5 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 2.4 acres, this one is smaller than 64% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Barkala R F, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Up State Bridge Corporation Limited in Saharanpur

All 17 Up State Bridge Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.