Proposed Forest Land to Be Diverted for Construction 3rd Line Between Barabanki-Burhwal (26.99km) of North Eastern Railway

Proposed Forest Land to Be Diverted for Construction 3rd Line Between Barabanki-Burhwal (26.99km) of North Eastern Railway is a proposed railway project in Amdaha, Nawabganj, Bara Banki, Uttar Pradesh. The site covers 47.7 acres. Its stated project cost is ₹4.3 crore. As of 27 Nov 2026, its status is “Under forest review” (since 24 Nov 2026).

See it on the live map All projects in Bara Banki

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder forest review
Status since24 Nov 2026
Application filed23 Nov 2026
Approval soughtForest land use
Application typeNew project
SectorRailways & metro
ApplicantLal Bahadur
Land area47.7 acres (19.3 ha)
Forest land33.6 acres (13.6 ha)
Project cost₹4.3 crore
Village / localityAmdaha
Taluk / tehsilNawabganj
DistrictBara Banki
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05796

In context

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Amdaha, Nawabganj, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.