Proposed Protected Forest Land to be diverted for two lane Widening and Strengthening of Gulaothi Aabadi Marg from NH-334 is a lapsed road project in Saraundhan, Hapur, Uttar Pradesh. The site covers 4.1 acres.
Who is building it?
The applicant is Executive Engineer Construction Div.
Has it been approved?
No. The application was lapsed on 6 Aug 2025, so it is no longer under consideration.
Where is it?
In Saraundhan, Hapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3 crore; a site of 4.1 acres and 4.1 acres (1.7 ha) of forest land.
When was it filed?
The application was filed on 1 Sept 2024.
Project details
| Official title | Proposed Protected Forest Land to be diverted for two lane Widening and Strengthening of Gulaothi Aabadi Marg from NH-334, in District: Bulandshahr. |
|---|---|
| Status | Lapsed |
| Status since | 6 Aug 2025 |
| Application filed | 1 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Construction Div |
| Land area | 4.1 acres (1.7 ha) |
| Forest land | 4.1 acres (1.7 ha) |
| Project cost | ₹3 crore |
| Village / locality | Saraundhan |
| Taluk / tehsil | Hapur |
| District | Hapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05948 |
In context
7 applications in Hapur since January 2022 are in the same category (Roads & highways): 3 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Saraundhan, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Badauda Sihani Soil Mining Project — under environmental review, 6.6 km away
- "Ordinary Earth Mine", Village- Badoda Sihani, Gata No.- 1289, 1299Mi., 1305,… — environmental approval granted, 6.9 km away
- Dfccil New Gulawathi Crossing Station — lapsed, 7 km away
- 11 KV Line for Dfcc New Gulawthi Station — lapsed, 7 km away
- "Ordinary Earth/ Soil Mine", Village- Baroda Sihani, Tehsil- Dhaulana,… — environmental approval granted, 7.3 km away
- Harsinghpur Soil Mining Project — under environmental review, 7.4 km away
- Diversion of 0.0575 ha of PF land for proposed filling station on Chainage 45… — forest land use approved, 8.4 km away
- Diversion of Remaining Forest Land for the Proposed Fuel Station Site of M/S… — forest land use approved, 8.4 km away
All 3 Executive Engineer Construction, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.