What is Developing? Open the mapMap

Forest land use approvedFuel stations · Balrampur, Uttar Pradesh

Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL Retail Outlet

Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Balrampur, Uttar Pradesh. The site covers 1 acre. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 20 Jun 2024).

See it on the live map All projects in Balrampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Balrampur, Uttar Pradesh. The site covers 1 acre.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 20 Jun 2024), as of 27 Nov 2026.

Where is it?

In Balrampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 1 acre and 2,590 m² of forest land.

When was it filed?

The application was filed on 21 Dec 2023.

Project details

Official titleProposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Balrampur Dehat, Tehsil:- Balrampur, District:- Balrampur.
StatusForest land use approved
Status since20 Jun 2024
Application filed21 Dec 2023
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1 acres (0.4 ha)
Forest land2,590 m²
Project cost₹60 lakh
Village / localityBalrampur
Taluk / tehsilBalrampur
DistrictBalrampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06055

In context

16 applications in Balrampur since January 2022 are in the same category (Fuel stations): 13 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 1 acre, this one is larger than 88% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Balrampur

All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.