Project details
| Status | Forest land use approved |
|---|---|
| Status since | 20 Feb 2024 |
| Application filed | 17 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1,900 m² |
| Project cost | ₹65 lakh |
| Village / locality | Mahau Pathak |
| Taluk / tehsil | Powayan |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06089 |
In context
23 applications in Shahjahanpur since January 2022 are in the same category (Fuel stations): 10 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1 acre, this one is larger than 65% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahau Pathak, Powayan, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — lapsed, 0 m away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to… — forest land use approved, 1.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.2 km away
- Rehriya Soil Mining Project — under environmental review, 3.4 km away
- Proposed Forest Land to be Diverted for Temporary of Establishment HSD Petrol… — lapsed, 4.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 8 km away
- Kuberpur Soil Mining Project — environmental approval granted, 9.2 km away
- Dadiura Soil Mining Project — environmental approval granted, 12.9 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Shahjahanpur
- ProposedProtected Forest Land to be diverted for Laying of Gas Pipe Line along… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — lapsed
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — forest land use approved
7 Hindustan Petroleum Corporation (HPCL) projects in Shahjahanpur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.