Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach to M/S ROSS enterprises Cold storage is a lapsed building project in Bachhrayun, Dhanaura, Amroha, Uttar Pradesh. The site covers 6.1 acres.
Who is building it?
The applicant is Gursher inder Singh Kahlon.
Has it been approved?
No. The application was lapsed on 25 Sept 2026, so it is no longer under consideration.
Where is it?
In Bachhrayun, Dhanaura, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹25 crore; a site of 6.1 acres and 240 m² of forest land.
When was it filed?
The application was filed on 11 Dec 2024.
Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to M/S ROSS enterprises Cold storage at Village:-Fatehpur near Bachraun, Tehsil:-Dhanaura, District:-Amroha. |
|---|---|
| Status | Lapsed |
| Status since | 25 Sept 2026 |
| Application filed | 11 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gursher inder Singh Kahlon |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 240 m² |
| Project cost | ₹25 crore |
| Village / locality | Bachhrayun |
| Taluk / tehsil | Dhanaura |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06169 |
In context
14 applications in Amroha since January 2022 are in the same category (Buildings & townships): 3 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. At 6.1 acres, this one is smaller than 57% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bachhrayun, Dhanaura, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Retail Outlet of Bpcl Meerut, Forest Land Is Required to Be Diverted As… — forest land use approved, 1.9 km away
- Proposed Protected Forest Land To Be Diverted To Provincial Division Public… — under forest review, 2.5 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Megha… — forest land use approved, 3.7 km away
- Expansion from Steel Billets/Bloom - 30000 TPA to 250000 TPA, TMT/Round/Bars -… — cleared for impact study, 4.2 km away
- Expansion of existing distillery from 140 KLD (B Heavy Molasses/ Cane Juice… — environmental approval granted, 4.3 km away
- Expansion of Existing Distillery Capacity From 100 Kld to 150 Kld on C Heavy… — initial checks, 4.3 km away
- Expansion of existing distillery from 140 KLD (B Heavy Molasses/ Cane Juice… — returned to applicant, 4.3 km away
- Ordinary Soil Mine — environmental approval granted, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.