Quick answers
What is this project?
Proposed Forest Land to be diverted for Four Lane connectivity from Kaushambi Paryatak Sthal to Allahabad Mukhyalay via Airport is a proposed road project in Tarni, Chail, Kaushambi, Uttar Pradesh. The site covers 46.3 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Tarni, Chail, Kaushambi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹808.9 crore; a site of 46.3 acres and 25.7 acres (10.4 ha) of forest land.
When was it filed?
The application was filed on 19 Jul 2023.
Project details
| Official title | Proposed Forest Land to be diverted for Four Lane connectivity from Kaushambi Paryatak Sthal to Allahabad Mukhyalay via Airport, in District: Kaushambi |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 23 Sept 2026 |
| Application filed | 19 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 46.3 acres (18.7 ha) |
| Forest land | 25.7 acres (10.4 ha) |
| Project cost | ₹808.9 crore |
| Village / locality | Tarni |
| Taluk / tehsil | Chail |
| District | Kaushambi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06284 |
Where it is
Tarni, Chail, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Moram Mining Project" — under environmental review, 8.8 km away
- "Sand/Moram Mining Project" — cleared for impact study, 8.8 km away
- Bhart Net — lapsed, 9.2 km away
- Proposed Project of "Morrum Mining" on the riverbed of Yamuna River at Khand… — under environmental review, 9.7 km away
- Proposed Project of "Morrum Mining" on the riverbed of Yamuna River at Khand… — under environmental review, 9.7 km away
- Environmental Clearance for Proposed River Bed Sand/Morrum Mining Having Lease… — environmental approval granted, 9.7 km away
- Morrum Mine — lapsed, 12.1 km away
- Proposed riverbed morrum mining project from Yamuna River of Shri Kunwar… — environmental approval granted, 14 km away
All 43 Public Works Department, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.