LapsedRoads & highways · Muzaffarnagar, Uttar Pradesh

Proposed Protected Forest Land to be Re- diverted for Laying of steel Gas Pipeline with OFC along NH-709AD Ch. Km 73.680 to Ch. Km 75.850 and Muzaffarnagar Spur (Bypass) Connecting NH-709AD & NH-58 Along from Design Ch. Km 1.000 to Design Ch. Km 9.300 RHS & Design Ch. Km 9.300 to Design Ch. 9.680 LHS for total Approx 10.850 Km by HPCL

Proposed Protected Forest Land to be Re- diverted for Laying of steel Gas Pipeline with OFC along NH-709AD Ch. Km 73.680 to Ch. Km 75.850 and Muzaffarnagar Spur (Bypass) Connecting NH-709AD & NH-58 Along from Design Ch. Km 1.000 to Design Ch. Km 9.300 RHS & Design Ch. Km 9.300 to Design Ch. 9.680 LHS for total Approx 10.850 Km by HPCL is a lapsed road project in Dadheru Khurd, Muzaffarnagar, Uttar Pradesh. The site covers 1.5 acres. Its stated project cost is ₹12 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 14 Sept 2023).

See it on the live map All projects in Muzaffarnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed Protected Forest Land to be Re- diverted for Laying of steel Gas Pipeline with OFC along NH-709AD Ch. Km 73.680 to Ch. Km 75.850 and Muzaffarnagar Spur (Bypass) Connecting NH-709AD & NH-58 Along from Design Ch. Km 1.000 to Design Ch. Km 9.300 RHS & Design Ch. Km 9.300 to Design Ch. 9.680 LHS for total Approx 10.850 Km in District-Muzaffarnagar, Uttar Pradesh.
StatusLapsed
Status since14 Sept 2023
Application filed14 Jun 2023
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1.5 acres (0.6 ha)
Forest land1.5 acres (0.6 ha)
Project cost₹12 lakh
Village / localityDadheru Khurd
Taluk / tehsilMuzaffarnagar
DistrictMuzaffarnagar
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06312

In context

15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.5 acres, this one is smaller than 62% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dadheru Khurd, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Muzaffarnagar

6 Hindustan Petroleum Corporation (HPCL) projects in Muzaffarnagar
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.