One of 2 filings for this project. The project's main page, with every filing and where each stands: PROPOSAL OF RE-DIVERSION OF PROTECTED FOREST LAND FOR PROPOSED LAYING UNDERGROUND…
Project details
| Official title | Proposal of Re-Diversion of Protected Forest Land for Proposed Laying Underground Optical Fiber Cable (Ofc) for 5g Network Work by M/S Bharti Airtel Limited Along With Road, Within the Already Diverted Row of Roads Meerut Baghpat Road (Nh-334b) From Km Chainage 29.8 to Km Chainage 30.145 Lhs ,bahgpat Barout Road (Nh-709b) From 24.9 to 25.355 Km Lhs (Including Road Crossings) Total Distance= 345+455=800 Meter and Total 0.0410 Ha of Pf Proposed for Re Diversion Area (Without Tree Felling) of Prote |
|---|---|
| Status | Lapsed |
| Status since | 14 Jul 2024 |
| Application filed | 13 Apr 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 400 m² |
| Forest land | 410 m² |
| Project cost | ₹12 lakh |
| Village / locality | Baraut Patti Mahar Or Baru |
| Taluk / tehsil | Baraut |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06399 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 13 May 2024 | Lapsed | 0.1 acres | ₹12 lakh |
| Change of use filed 13 Apr 2024 (this page) | Lapsed | 0.1 acres | ₹12 lakh |
In context
5 applications in Baghpat since January 2022 are in the same category (Telecom): 1 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baraut Patti Mahar Or Baru, Baraut, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSAL OF RE-DIVERSION OF PROTECTED FOREST LAND FOR PROPOSED LAYING… — lapsed, 0 m away
- Proposal of Diversion of 0.0343 Hactare Protected Forest Land of Eastern… — forest land use approved, 2.6 km away
- Bharti Airtel Ltd. 5G OFC Project Baraut -Saidbahar-Meerut route DFO Baghpat — lapsed, 5.2 km away
- Project Related to Nagar Palika Parisahd Baghpat and Baraut Reorganisation… — more information requested, 5.9 km away
- Gauripur Jawaharnagar Soil Mining Project — environmental approval granted, 7.4 km away
- Baghu Soil Mining Project — environmental approval granted, 8.1 km away
- Banas Dairy (Amul) — environmental approval granted, 8.6 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To M/S… — forest land use approved, 8.6 km away
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.