Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Apr 2025 |
| Application filed | 30 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Kushal Tripathi |
| Land area | 2,900 m² |
| Forest land | 1,630 m² |
| Project cost | ₹55 lakh |
| Village / locality | Bamnagar |
| Taluk / tehsil | Palia |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06442 |
In context
11 applications in Kheri since January 2022 are in the same category (Fuel stations): 6 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.7 acres, this one is smaller than 55% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bamnagar, Palia, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of Proposal of Proposed Protected Forest Land to be Diverted for… — forest land use approved, 0 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2.4 km away
- Diversion of 0.8804 Ha. of Forest Land for Laying Drinking Water Pipeline (1.)… — lapsed, 2.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Resort/Housing… — initial checks, 4.9 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.3 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to… — lapsed, 8.3 km away
- Submission of Perposal of Proposed Protected Forest Land to Be Diverted for… — lapsed, 8.3 km away
More from Kushal Tripathi in Kheri
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.