One of 2 filings for this project. The project's main page, with every filing and where each stands: Patwadh Group of Villages Water Supply Scheme in Villages of Robertsganj and Ghorawal…
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Aug 2026 |
| Application filed | 20 Sept 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Uttar Pradesh Water Supply and Sanitation Mission |
| Land area | 81.2 acres (32.9 ha) |
| Forest land | 15.1 acres (6.1 ha) |
| Project cost | ₹787.3 crore |
| Village / locality | Patwadh |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06466 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Sept 2022 | Decision issued | ₹787.3 crore | |
| New project filed 20 Sept 2022 (this page) | More information requested | 81.2 acres | ₹787.3 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patwadh, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kadara Group of Villages Water Supply Scheme, District Sonbhadra — decision issued, 2 km away
- Kadara Group of Villages Water Supply Scheme, District Sonbhadra — in-principle approval, conditions pending, 2 km away
- Patwadh Group of Villages Water Supply Scheme in Villages of Robertsganj and… — decision issued, 4.9 km away
- Kadra Group of Villages Water Supply Scheme, District Sonbhadra. — application filed, 5.3 km away
- Kadra Group of Villages Water Supply Scheme, District Sonbhadra. — lapsed, 5.3 km away
- 4g Saturation Projcet Mission 500_Dugaulia — forest land use approved, 6 km away
- 4g Saturation Projcet Mission 500_Village:-Dugaulia — decision issued, 6.1 km away
- Proposed Reserved Forest Land to be diverted for Construction of Tilhar Link… — more information requested, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.