What is Developing? Open the mapMap

LapsedFuel stations · Jaunpur, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet

Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Jhansapur, Machhlishahr, Jaunpur, Uttar Pradesh. The site covers 0.7 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 25 Aug 2026).

See it on the live map All projects in Jaunpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Jhansapur, Machhlishahr, Jaunpur, Uttar Pradesh. The site covers 0.7 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

No. The application was lapsed on 25 Aug 2026, so it is no longer under consideration.

Where is it?

In Jhansapur, Machhlishahr, Jaunpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 0.7 acres and 1,330 m² of forest land.

When was it filed?

The application was filed on 27 Sept 2025.

Project details

Official titleProposed Protected Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village: - Jahansapur, Tehsil: - Machhalishahar, District: -Jaunpur.
StatusLapsed
Status since25 Aug 2026
Application filed27 Sept 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area2,800 m²
Forest land1,330 m²
Project cost₹55 lakh
Village / localityJhansapur
Taluk / tehsilMachhlishahr
DistrictJaunpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06507

In context

21 applications in Jaunpur since January 2022 are in the same category (Fuel stations): 10 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.7 acres, this one is smaller than 76% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jhansapur, Machhlishahr, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Jaunpur

9 Indian Oil Corporation (IOCL) projects in Jaunpur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.