Quick answers
What is this project?
Proposed forest Land to be diverted for Construction of Drain & Culvert is a proposed project in Basai Bilasa, Bahraich, Uttar Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Uttar Pradesh Awas Evam Vikas Parishad.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Basai Bilasa, Bahraich, Uttar Pradesh.
How big is it?
It has a stated cost of ₹6.1 crore; a site of 1.7 acres and 1.6 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 25 Oct 2026.
Project details
| Official title | Proposed forest Land to be diverted for Construction of Drain & Culvert, in District: Bahraich (Uttar Pradesh). |
|---|---|
| Status | Under forest review |
| Status since | 2 Nov 2026 |
| Application filed | 25 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Uttar Pradesh Awas Evam Vikas Parishad |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.6 acres (0.6 ha) |
| Project cost | ₹6.1 crore |
| Village / locality | Basai Bilasa |
| Taluk / tehsil | Bahraich |
| District | Bahraich |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06606 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Basai Bilasa, Bahraich, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy… — lapsed, 1.5 km away
- Railway Over Bridge — in-principle approval, conditions pending, 3.9 km away
- "Ordinary Earth Mine" — environmental approval granted, 4 km away
- Proposed Retail Outlet by Bharat Petroleum Corp. Ltd. in Km. 09, at Chainage.… — more information requested, 4.1 km away
- "Ordinary Earth Mine" — environmental approval granted, 4.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — in-principle approval, conditions pending, 5.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 5.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.