Forest land use approvedRoads & highways · Saharanpur, Uttar Pradesh

Telecom Towers within the ROW of Six- lane access-controlled highway from Design Chainage 0 000 (Ganeshpur) to Design Chainage 16 160 (Daat Kali Tunnel) of Ganeshpur – Dehradun section of NH-307 (old NH 72A) in Shiwalik Reserve Forest

Telecom Towers within the ROW of Six- lane access-controlled highway from Design Chainage 0 000 (Ganeshpur) to Design Chainage 16 160 (Daat Kali Tunnel) of Ganeshpur – Dehradun section of NH-307 (old NH 72A) in Shiwalik Reserve Forest is an approved road project in Nagal Ismilpur, Behat, Saharanpur, Uttar Pradesh. The site covers 117.9 acres. Its stated project cost is ₹2,060 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 9 Jul 2026).

See it on the live map All projects in Saharanpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Telecom Towers within the ROW of Six- lane access-controlled highway from Design Chainage 0 000 (Ganeshpur) to Design Chainage 16 160 (Daat Kali Tunnel) of Ganeshpur – Dehradun section of NH-307 (old NH 72A) in Shiwalik Reserve Forest is an approved road project in Nagal Ismilpur, Behat, Saharanpur, Uttar Pradesh. The site covers 117.9 acres.

Who is building it?

The applicant is National Highway Authority of India.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 9 Jul 2026), as of 27 Nov 2026.

Where is it?

In Nagal Ismilpur, Behat, Saharanpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2,060 crore; a site of 117.9 acres and 117.9 acres (47.7 ha) of forest land.

When was it filed?

The application was filed on 21 Oct 2025.

Project details

Official titleProposal for Installation of Telecom Towers within the ROW of Six- lane access-controlled highway from Design Chainage 0 000 (Ganeshpur) to Design Chainage 16 160 (Daat Kali Tunnel) of Ganeshpur – Dehradun section of NH-307 (old NH 72A) in Shiwalik Reserve Forest in Saharanpur District of Uttar Pradesh
StatusForest land use approved
Status since9 Jul 2026
Application filed21 Oct 2025
Approval soughtForest land use
Application typeAmendment
SectorRoads & highways
ApplicantNational Highway Authority of India
Land area117.9 acres (47.7 ha)
Forest land117.9 acres (47.7 ha)
Project cost₹2,060 crore
Village / localityNagal Ismilpur
Taluk / tehsilBehat
DistrictSaharanpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06626

In context

11 applications in Saharanpur since January 2022 are in the same category (Roads & highways): 5 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 117.9 acres, this one is larger than 82% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nagal Ismilpur, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highway Authority of India in Saharanpur

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.