What is Developing? Open the mapMap

LapsedBuildings & townships · Unnao, Uttar Pradesh

Proposed Forest Land to be diverted for entry/exit approach to Property of Vaibhav Buildtech Private Limited on Lucknow to Kanpur Road

Proposed Forest Land to be diverted for entry/exit approach to Property of Vaibhav Buildtech Private Limited on Lucknow to Kanpur Road is a lapsed building project in Mahnora, Hasanganj, Unnao, Uttar Pradesh. The site covers 0.4 acres. Its stated project cost is ₹10 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 2 Nov 2023).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be diverted for entry/exit approach to Property of Vaibhav Buildtech Private Limited on Lucknow to Kanpur Road is a lapsed building project in Mahnora, Hasanganj, Unnao, Uttar Pradesh. The site covers 0.4 acres.

Who is building it?

The applicant is Vaibhav Build Tech PVT LTD.

Has it been approved?

No. The application was lapsed on 2 Nov 2023, so it is no longer under consideration.

Where is it?

In Mahnora, Hasanganj, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹10 lakh; a site of 0.4 acres and 810 m² of forest land.

When was it filed?

The application was filed on 2 Aug 2023.

Project details

Official titleProposed Forest Land to be diverted for entry/exit approach to Property of Vaibhav Buildtech Private Limited on Lucknow to Kanpur Road at Village– Mahnora, Tehsil– Hasanganj, in District– Unnao.
StatusLapsed
Status since2 Nov 2023
Application filed2 Aug 2023
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantVaibhav Build Tech PVT LTD
Land area1,700 m²
Forest land810 m²
Project cost₹10 lakh
Village / localityMahnora
Taluk / tehsilHasanganj
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06672

In context

28 applications in Unnao since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.4 acres, this one is smaller than 96% of them.

16 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mahnora, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.