What is Developing? Open the mapMap

Forest land use approvedFuel stations · Deoria, Uttar Pradesh

Proposed Forest Land to be diverted for Entry/Exit Approach to HPCL Retail Out-let

Proposed Forest Land to be diverted for Entry/Exit Approach to HPCL Retail Out-let is an approved fuel station in Gauri Khurd, Deoria, Uttar Pradesh. The site covers 1.1 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 25 Apr 2026).

See it on the live map All projects in Deoria

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be diverted for Entry/Exit Approach to HPCL Retail Out-let is an approved fuel station in Gauri Khurd, Deoria, Uttar Pradesh. The site covers 1.1 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 25 Apr 2026), as of 27 Nov 2026.

Where is it?

In Gauri Khurd, Deoria, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 1.1 acres and 3,100 m² of forest land.

When was it filed?

The application was filed on 3 Nov 2025.

Project details

Official titleProposed Forest Land to be diverted for Entry/Exit Approach to HPCL Retail Out-let at Village:-Gauri Khurd, Tehsil:-Deoria, District:-Deoria.
StatusForest land use approved
Status since25 Apr 2026
Application filed3 Nov 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1.1 acres (0.4 ha)
Forest land3,100 m²
Project cost₹55 lakh
Village / localityGauri Khurd
Taluk / tehsilDeoria
DistrictDeoria
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06746

In context

18 applications in Deoria since January 2022 are in the same category (Fuel stations): 7 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.1 acres, this one is larger than 78% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gauri Khurd, Deoria, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Deoria

3 Hindustan Petroleum Corporation (HPCL) projects in Deoria
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.