Quick answers
What is this project?
Proposed reserved forest land to be diverted for Construction of Minor Bridge, Approach Road and Additional Approach Road is a lapsed road project in Mau, Konch, Jalaun, Uttar Pradesh. The site covers 4.8 acres.
Who is building it?
The applicant is Pdpwdorai.
Has it been approved?
No. The application was lapsed on 31 Aug 2025, so it is no longer under consideration.
Where is it?
In Mau, Konch, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.7 crore; a site of 4.8 acres and 4.8 acres (1.9 ha) of forest land.
When was it filed?
The application was filed on 24 Jul 2025.
Project details
| Official title | Proposed reserved forest land to be diverted for Construction of Minor Bridge, Approach Road and Additional Approach Road in District: Jalaun. |
|---|---|
| Status | Lapsed |
| Status since | 31 Aug 2025 |
| Application filed | 24 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Pdpwdorai |
| Land area | 4.8 acres (2 ha) |
| Forest land | 4.8 acres (1.9 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Mau |
| Taluk / tehsil | Konch |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06783 |
In context
10 applications in Jalaun since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 4.8 acres, this one is larger than 60% of them.
Where it is
Mau, Konch, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed reserved forest Land to be diverted for Infrastructure Facility in… — in-principle approval, conditions pending, 7.5 km away
- Proposed Forest Land to be Diverted for New Construction of Road — in-principle approval, conditions pending, 10.8 km away
- Proposed Forest Land to be Diverted for New Construction of Road — in-principle approval, conditions pending, 13 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 14 km away
- Laying BSNL OFC Ccble from Moth TE to Ait TE along LHS of NH-27 (Dheri Ki… — lapsed, 27.1 km away
- Proposed Forest Land to be diverted for Construction of Link Road — more information requested, 29.4 km away
- Proposed Exit/Entry Approach to IOCL Retail Outlet on Ait-Kotra Road (ODR) in… — forest land use approved, 32.5 km away
- Proposed Forest Land to be diverted for Widening and Construction of Road — initial checks, 35.7 km away
More from Pdpwdorai in Jalaun
- Proposed Forest Land to be Diverted for New Construction of Road — in-principle approval, conditions pending
- Proposed Forest Land to be Diverted for New Construction of Road — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.