Project details
| Status | More information requested |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Leelakrishna Industries Private Limited |
| Land area | 940.4 acres (380.6 ha) |
| Forest land | 394.3 acres (159.6 ha) |
| Project cost | ₹28 crore |
| Village / locality | Dhauri Sagar |
| Taluk / tehsil | Mahroni |
| District | Lalitpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06809 |
In context
75 applications in Lalitpur since January 2022 are in the same category (Mining): 59 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 940.4 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Dhauri Sagar, Mahroni, Lalitpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sonrai Block II-IV Phosphorite Mine" with mining lease area of 221 hectare,… — cleared for impact study, 600 m away
- Sonrai Phosphorite Block -5 (147.46ha) — lapsed, 3.3 km away
- obtaining Environment Clearance for proposed Sonari Phosphorite Block V Mine"… — lapsed, 3.3 km away
- G2 Level Exploration for Phosphorite Block 5 — lapsed, 3.4 km away
- Proposed Forest Land to be Diverted for Construction of Kurrat Link Road from… — under forest review, 6.6 km away
- Proposed Forest Land to be Diverted for Construction of Lakhanjar Link Road… — under forest review, 7.1 km away
- Land Acquisition for 4G mobile services BTS by BSNL Jhansi — lapsed, 8.8 km away
- Proposed Forest Land to be Diverted for Construction of Paparon Link Road from… — under forest review, 9.2 km away
More from Leelakrishna Industries Private Limited in Lalitpur
- "Sonrai Block II-IV Phosphorite Mine" with mining lease area of 221 hectare,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.