LapsedTelecom · Meerut, Uttar Pradesh

Laying Underground Optical Fiber Cable Row in Lekha Nagar

Laying Underground Optical Fiber Cable Row in Lekha Nagar is a lapsed telecom project in Municipal Area), Meerut, Uttar Pradesh. The site covers 9.4 acres. Its stated project cost is ₹2 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 11 Jan 2026).

See it on the live map All projects in Meerut

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since11 Jan 2026
Application filed12 Dec 2025
Approval soughtForest land use
Application typeChange of use
SectorTelecom
ApplicantBharti Airtel Limited
Land area9.4 acres (3.8 ha)
Forest land410 m²
Project cost₹2 lakh
Village / localityMunicipal Area)
Taluk / tehsilMeerut
DistrictMeerut
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06842

In context

13 applications in Meerut since January 2022 are in the same category (Telecom): 0 approved, 1 filed or under review, and 12 withdrawn, lapsed or rejected. At 9.4 acres, this one is smaller than 60% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Municipal Area), Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharti Airtel Limited in Meerut

6 Bharti Airtel (Airtel) projects in Meerut
All 485 Bharti Airtel (Airtel) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.