| Official title | OFC Laying Works of ADSS OFC (Overhead Laying) along with Kone to Chanchi Kalna(3.75 km),ChanchiKalna to ChanchiKhurd(0.61 km),(Total Length=4.360km & Total Area=0.1308 ha), in district Sonbhdra under BSNL 4G saturation Project. |
|---|---|
| Status | Under forest review |
| Status since | 17 Nov 2026 |
| Application filed | 27 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 1,310 m² |
| Project cost | ₹5 lakh |
| Village / locality | Chanchi Kalan |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06845 |
In context
18 applications in Sonbhadra since January 2022 are in the same category (Telecom): 5 approved, 3 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chanchi Kalan, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project — more information requested, 250 m away
- Laying of ADSS Optical Fibre Cable(aerial installation) — lapsed, 350 m away
- 4g Saturation Projcet Mission 500_Chanchi Kalna — forest land use approved, 1.7 km away
- Laying of ADSS Optical Fibre Cable(aerial installation) — lapsed, 1.8 km away
- 4G Saturation Projcet mission 500_Nakatvar — forest land use approved, 4.3 km away
- 4g Saturation Project — forest land use approved, 4.8 km away
- Permission for Drilling of Boreholes in Tariya Range of Obra Forest Division… — forest land use approved, 6.2 km away
- Greenko UP01 Off-Stream Closed Loop Pumped Storage Project — lapsed, 6.9 km away
More from Mahesh Nair in Sonbhadra
- 4g Saturation Project — more information requested
- 4g Saturation Project — in-principle approval, conditions pending
- OFC Laying along with Hathinala to Ranitali road,District:- Sonbhadra (Uttar… — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
- 4g Saturation Project — forest land use approved
- 4g Saturation Project — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.