What is Developing? Open the mapMap

LapsedRoads & highways · Bareilly, Uttar Pradesh

Protected Forest Land Is Proposed to Be Diverted for Fencing and Planting Work Propsed by Publik Works Department in the Project Under National Clean Air Programto Facilitate the Traffic and Prevent Air Pollution at Bareilly- Nanital Road From Ivri Bridge to Nainital Road, the Municipal Corporation's Boundary Total Length 2.4 Km

Protected Forest Land Is Proposed to Be Diverted for Fencing and Planting Work Propsed by Publik Works Department in the Project Under National Clean Air Programto Facilitate the Traffic and Prevent Air Pollution at Bareilly- Nanital Road From Ivri Bridge to Nainital Road, the Municipal Corporation's Boundary Total Length 2.4 Km is a lapsed road project in Bareily (Municipal Area), Bareilly, Uttar Pradesh. It seeks 1.2 acres of forest land. Its stated project cost is ₹5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 17 Sept 2026).

See it on the live map All projects in Bareilly

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Protected Forest Land Is Proposed to Be Diverted for Fencing and Planting Work Propsed by Publik Works Department in the Project Under National Clean Air Programto Facilitate the Traffic and Prevent Air Pollution at Bareilly- Nanital Road From Ivri Bridge to Nainital Road, the Municipal Corporation's Boundary Total Length 2.4 Km is a lapsed road project in Bareily (Municipal Area), Bareilly, Uttar Pradesh. It seeks 1.2 acres of forest land.

Who is building it?

The applicant is Public Works Department.

Has it been approved?

No. The application was lapsed on 17 Sept 2026, so it is no longer under consideration.

Where is it?

In Bareily (Municipal Area), Bareilly, Uttar Pradesh.

How big is it?

It has a stated cost of ₹5 crore and 1.2 acres (0.5 ha) of forest land.

When was it filed?

The application was filed on 3 Jun 2025.

Project details

Official titleProtected Forest Land Is Proposed to Be Diverted for Fencing and Planting Work Propsed by Publik Works Department in the Project Under National Clean Air Programto Facilitate the Traffic and Prevent Air Pollution at Bareilly- Nanital Road From Ivri Bridge to Nainital Road, the Municipal Corporation's Boundary Total Length 2.4 Km, in Tehsil - Sadar, District Bareilly Uttar Pradesh
StatusLapsed
Status since17 Sept 2026
Application filed3 Jun 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPublic Works Department
Forest land1.2 acres (0.5 ha)
Project cost₹5 crore
Village / localityBareily (Municipal Area)
Taluk / tehsilBareilly
DistrictBareilly
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06859

In context

13 applications in Bareilly since January 2022 are in the same category (Roads & highways): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bareily (Municipal Area), Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Public Works Department in Bareilly

4 Public Works Department, Uttar Pradesh projects in Bareilly
All 43 Public Works Department, Uttar Pradesh projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.