| Official title | Proposed Forest Land to Be Diverted for Construction of Village Connecting Road From Dewa Chinhat Road to Taikala Via Gauria Link Road in District:- Barabanki. |
|---|---|
| Status | Lapsed |
| Status since | 10 Dec 2023 |
| Application filed | 4 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Rural Development |
| Land area | 19.2 acres (7.8 ha) |
| Forest land | 3,930 m² |
| Project cost | ₹7.3 crore |
| Village / locality | Murtazanagar |
| Taluk / tehsil | Nawabganj |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06894 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Dec 2023 | More information requested | 19.2 acres | ₹7.3 crore |
| New project filed 4 Sept 2023 (this page) | Lapsed | 19.2 acres | ₹7.3 crore |
In context
24 applications in Bara Banki since January 2022 are in the same category (Fuel stations): 14 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 19.2 acres, this one is larger than 96% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Murtazanagar, Nawabganj, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to Be Diverted for Construction of Village Connecting… — more information requested, 650 m away
- Bharat Net — lapsed, 2.9 km away
- Bharat Net Special Project on Behalf of Bsnl — lapsed, 3.4 km away
- SOIL EXCAVATION PROJECT At Gata Nos. 187,188,189,190,177&132/3 Total Area –… — environmental approval granted, 4 km away
- "shalimar Gallant Metropolis" — environmental approval granted, 4.5 km away
- "shalimar Gallant Metropolis" — cleared for impact study, 4.5 km away
- Proposed Forest Land to Be Diverted in Favour of Executive Engineer,… — more information requested, 5.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to Commercial… — forest land use approved, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.