Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC)

Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) is a lapsed telecom project in Lohrauli, Harraiya, Basti, Uttar Pradesh. The site covers 1.8 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 21 Feb 2026).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) is a lapsed telecom project in Lohrauli, Harraiya, Basti, Uttar Pradesh. The site covers 1.8 acres.

Who is building it?

The applicant is Jio Digital Fiber Private Limited.

Has it been approved?

No. The application was lapsed on 21 Feb 2026, so it is no longer under consideration.

Where is it?

In Lohrauli, Harraiya, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.7 crore; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 18 Feb 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of…

Project details

Official titleProposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) along with road, within the already diverted RoW of roads at NH-28 {Lucknow-Gorakhpur Road (Basti/Faizabad Border to Basti) Left/Right Side} from Km. 143.600 to Km. 197.000 and at Old NH-28 {Basti City Road (Company Bagh, Basti to Munderwa) Left/Right Side} from Km. 6.00 (Old Km. 203.000) to Km. 21.00 (Old Km. 218.000) of total Km. 68.40 & 0.7209 Ha. in Social Forestry Division Basti, D
StatusLapsed
Status since21 Feb 2026
Application filed18 Feb 2026
Approval soughtForest land use
Application typeChange of use
SectorTelecom
ApplicantJio Digital Fiber Private Limited
Land area1.8 acres (0.7 ha)
Forest land1.8 acres (0.7 ha)
Project cost₹1.7 crore
Village / localityLohrauli
Taluk / tehsilHarraiya
DistrictBasti
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06897

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 22 Mar 2026More information requested1.8 acres₹1.7 crore
Change of use filed 18 Feb 2026 (this page)Lapsed1.8 acres₹1.7 crore

In context

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Lohrauli, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.