Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Bhikhipur, Tehsil:-Raja Talab, District:- Varanasi. |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Jul 2024 |
| Application filed | 26 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,900 m² |
| Forest land | 370 m² |
| Project cost | ₹55 lakh |
| Village / locality | Bhikharipur Kala |
| Taluk / tehsil | Sadar |
| District | Varanasi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06938 |
In context
6 applications in Varanasi since January 2022 are in the same category (Fuel stations): 6 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhikharipur Kala, Sadar, Varanasi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to Gail… — forest land use approved, 1.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Gail… — lapsed, 1.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 1.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL-Mittal… — forest land use approved, 4.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.6 km away
- Varanasi International Cricket Stadium by Uttar Pradesh Cricket Association — environmental approval granted, 6.7 km away
- Industrial project by Ethorka Private Limited — lapsed, 8.2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 9.5 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Varanasi
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
3 Hindustan Petroleum Corporation (HPCL) projects in Varanasi
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.