Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Rbml Solutions India Limited |
| Land area | 1 acres (0.4 ha) |
| Forest land | 770 m² |
| Project cost | ₹80 lakh |
| Village / locality | Ariyawana |
| Taluk / tehsil | Akbarpur |
| District | Ambedkar Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07038 |
In context
18 applications in Ambedkar Nagar since January 2022 are in the same category (Fuel stations): 14 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1 acre, this one is larger than 67% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ariyawana, Akbarpur, Ambedkar Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — lapsed, 2 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 2.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 3.1 km away
- Proposed protected forest land to be diverted for proposed additional CNG… — forest land use approved, 4.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — forest land use approved, 6.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 7.3 km away
All 3 Rbml Solutions India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.