Quick answers
What is this project?
Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat petroleum corporation Ltd Retail Outlet on Mathura-Govardhan-Deeg Road (MDR-94) in Between Km.16 (Ch.15.788 L.H.S.), At Khasra No.2402, Village: Aring, Tahsil Govardhan, District: Mathura (U.P.) is a lapsed fuel station in Aring, Mathura, Uttar Pradesh. The site covers 3.2 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
No. The application was lapsed on 28 May 2025, so it is no longer under consideration.
Where is it?
In Aring, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 3.2 acres and 930 m² of forest land.
When was it filed?
The application was filed on 7 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 7 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3.2 acres (1.3 ha) |
| Forest land | 930 m² |
| Project cost | ₹60 lakh |
| Village / locality | Aring |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07054 |
In context
9 applications in Mathura since January 2022 are in the same category (Fuel stations): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
Where it is
Aring, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening and Strengthing Work of Kosi-Nandgown-Barshana-Goverdhan-Sonkh-Mathura… — under forest review, 6.1 km away
- The diversion of road side Protected Forest Land for the construction of a… — lapsed, 6.4 km away
- Mathura Water Supply Scheme for Rural Areas based on surface source — forest land use approved, 9.4 km away
- "Ordinary Soil Mining" Project at Gata No.- 454, 455, 461, Village-Malsarai,… — under environmental review, 9.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 883, Village-Bachhgaon,… — initial checks, 9.6 km away
- Proposed Township "Omaxe Eternity-2" project at Khasra No. 361, 362, 363, 366,… — lapsed, 10.2 km away
- The diversion of Protected Forest Land under Section-2 of the Van (Sanrakshan… — forest land use approved, 10.6 km away
- Diversion of protected forest land for Construction of approach road to the… — forest land use approved, 11.4 km away
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.