Project details
| Status | Approval revoked |
|---|---|
| Status since | 26 Jun 2025 |
| Application filed | 27 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹12 lakh |
| Village / locality | R F |
| Taluk / tehsil | Chakia |
| District | Chandauli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07064 |
In context
14 applications in Chandauli since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 9 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
R F, Chakia, Chandauli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G SATURATION PROJECT MISSION 500_Semaria — forest land use approved, 3.4 km away
- 4G SATURATION PROJECT MISSION 500_Semaria — decision issued, 3.4 km away
- Under 4G Saturation Project Above ground / Overhead OFC laying is proposed… — in-principle approval, conditions pending, 3.7 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 4 km away
- Laying of Underground Optical Fibre Cable — lapsed, 4.9 km away
- 4G SATURATION PROJECT MISSION 500_Hinaut Ghat — forest land use approved, 5.6 km away
- 4G SATURATION PROJECT MISSION 500_Hinaut Ghat — decision issued, 5.6 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of an Additional… — lapsed, 5.9 km away
More from Mahesh Nair in Chandauli
- Under 4G Saturation Project Above ground / Overhead OFC laying is proposed… — in-principle approval, conditions pending
- Under 4G Saturation Project, underground OFC laying — in-principle approval, conditions pending
- OFC Laying Along with Madhupur to Naugarh Road, District: Sonbhadra — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
- Laying of Underground Optical Fibre Cable — lapsed
- Forest Land for Laying of Underground Optical Fibre Cable — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.