Quick answers
What is this project?
Proposed Forest Land to be diverted for Establishment of Uttar Pradesh Forestry University is an approved public facility in Bhar Baisi Rf, Pharenda, Mahrajganj, Uttar Pradesh. The site covers 123.6 acres.
Who is building it?
The applicant is Forestry Training Institute Kanpur.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 5 Mar 2026), as of 27 Nov 2026.
Where is it?
In Bhar Baisi Rf, Pharenda, Mahrajganj, Uttar Pradesh.
How big is it?
It has a stated cost of ₹621.3 crore; a site of 123.6 acres and 123.6 acres (50 ha) of forest land.
When was it filed?
The application was filed on 23 Mar 2025.
Project details
| Official title | Proposed Forest Land to be diverted for Establishment of Uttar Pradesh Forestry University, in District: Gorakhpur. |
|---|---|
| Status | Forest land use approved |
| Status since | 5 Mar 2026 |
| Application filed | 23 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Public facilities |
| Applicant | Forestry Training Institute Kanpur |
| Land area | 123.6 acres (50 ha) |
| Forest land | 123.6 acres (50 ha) |
| Project cost | ₹621.3 crore |
| Village / locality | Bhar Baisi Rf |
| Taluk / tehsil | Pharenda |
| District | Mahrajganj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07075 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhar Baisi Rf, Pharenda, Mahrajganj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Uttar Pradesh Forestry & Horticulture University", Gorakhpur, Uttar… — environmental approval granted, 200 m away
- The National Highway Authority of India (NHAI) has been entrusted for… — in-principle approval, conditions pending, 4 km away
- Proposed Forest Land to be Diverted for Construction of Water Tank — more information requested, 12.3 km away
- Project for Laying of Optical Fibre Cable (OFC) — lapsed, 12.3 km away
- Proposed Protected Forest Land to be diverted for Laying of Natural Gas… — lapsed, 17 km away
- Proposed Forest Land to be diverted for Laying of Natural Gas Pipeline along… — application filed, 17 km away
- Proposed Forest Land to be diverted for Laying of Natural Gas Pipeline along… — more information requested, 17 km away
- Proposed Protected Forest land to be diverted for construction of New Butwal… — in-principle approval, conditions pending, 20.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.