Project details
| Official title | Proposal for the Diversion of Road Side Protected Forest Land on Mathura-Sadabad-Jalesar-Awagarh Maarg (SH-122) Km 64, Ch- 63.953 , Lhs at Gata No.-1074, Village–kheriya Jamon, Tehsil-Jalesar, District–etah, for the Construction of Approach to Proposed Nayara Energy Limited Nro/Petrol Pump. |
|---|---|
| Status | Forest land use approved |
| Status since | 21 May 2025 |
| Application filed | 5 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 2,300 m² |
| Forest land | 960 m² |
| Project cost | ₹65 lakh |
| Village / locality | Jamon |
| Taluk / tehsil | Jalesar |
| District | Etah |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07122 |
In context
18 applications in Etah since January 2022 are in the same category (Fuel stations): 12 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.6 acres, this one is smaller than 78% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamon, Jalesar, Etah, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe… — initial checks, 2.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Natural Gas Pipe… — more information requested, 3.6 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — lapsed, 3.6 km away
- The Diversion of Road Side Protected Forest Land on… — forest land use approved, 6.2 km away
- Proposed Forest Land To Be Diverted to Uttar Pradesh Tourism Department For… — more information requested, 8.8 km away
- Proposed IOCL Retail Outlet on Mathura-Sadabad-Jalesar-Awagarh Road (SH-122)… — forest land use approved, 9 km away
- "Ordinary Soil Mining Project" at Gata No.- 87 — environmental approval granted, 14.4 km away
- Amended BharatNet Project (Awagarh-Etah) — lapsed, 16.8 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.