Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Sept 2025 |
| Application filed | 3 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Mayank shivhare |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 2,860 m² |
| Project cost | ₹67 lakh |
| Village / locality | Harau Mubarak |
| Taluk / tehsil | Mainpuri |
| District | Mainpuri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07162 |
In context
19 applications in Mainpuri since January 2022 are in the same category (Fuel stations): 15 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 1.1 acres, this one is larger than 68% of them.
Where it is
Harau Mubarak, Mainpuri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — under forest review, 15.4 km away
- Amended BharatNet Project (Sultanganj-Mainpuri) — lapsed, 19 km away
- Proposed Protected forest land to be diverted by Indian Oil Corporation Ltd… — forest land use approved, 22.8 km away
- Diversion of 0.0873 Hectare of protected Forest land under Social forestry… — forest land use approved, 25.5 km away
- Diversion of 0.0589460 Hectare of Protected Forest land under social forestry… — forest land use approved, 26.2 km away
- LILO of both ckt of 765 kV Aligarh (PG) - Orai (PG) line at Ghiror S/s — forest land use approved, 26.3 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — forest land use approved, 27 km away
- Proposed Reserved Forest Land to Be Diverted in Favour of Executive Engineer,… — in-principle approval, conditions pending, 27.1 km away
More from Mayank shivhare in Mainpuri
- Diversion of Protected Forest Land for Construction of Approach Road to the… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.