Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Lolpur Mustahkam, Tehsil:-Tarabganj, District:- Gonda. |
|---|---|
| Status | Lapsed |
| Status since | 18 Apr 2026 |
| Application filed | 21 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 2,300 m² |
| Forest land | 950 m² |
| Project cost | ₹70 lakh |
| Village / locality | Lolpur |
| Taluk / tehsil | Tarabganj |
| District | Gonda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07219 |
In context
17 applications in Gonda since January 2022 are in the same category (Fuel stations): 9 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.6 acres, this one is smaller than 100% of them.
Where it is
Lolpur, Tarabganj, Gonda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 400kV D/C Tanda - Gonda Transmission Line (LILO of one circuit of 400kV D/C… — forest land use approved, 5.7 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to HPCL Retail… — more information requested, 11.4 km away
- Proposed forest Land to be diverted for Widening & Strengthening of… — lapsed, 24.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 28.2 km away
- Improvement and up-gradation of newly declared National Highways NH-227B… — in-principle approval, conditions pending, 29.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 30.2 km away
- Proposed 690 KLPD B-heavy Molasses/Cane Syrup/Grain based Distillery — environmental approval granted, 31 km away
- Proposed 690 KLPD B-heavy Molasses/Cane Syrup/Grain based Distillery — cleared for impact study, 31 km away
More from Indian Oil Corporation Limited (IOCL) in Gonda
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed
7 Indian Oil Corporation (IOCL) projects in Gonda
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.