Project details
| Official title | Diversion of Proposed Forest Land To Be Diverted by UP State Bridge Corporation Ltd., Bridge Construction Unit Farrukhabad for Construction of Major Bridge, Approach Road, Additional Approach Road, and Protection Works on Yamuna River Between Village Aswa and Mahavir Pilua (near Village Rura) in District Etawah, Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 2 Nov 2026 |
| Application filed | 28 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 7.3 acres (3 ha) |
| Forest land | 4.7 acres (1.9 ha) |
| Project cost | ₹79.1 crore |
| Village / locality | Aswa |
| Taluk / tehsil | Etawah |
| District | Etawah |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07238 |
In context
15 applications in Etawah since January 2022 are in the same category (Roads & highways): 1 approved, 10 filed or under review, and 4 withdrawn, lapsed or rejected. At 7.3 acres, this one is larger than 80% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aswa, Etawah, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil mine Project — environmental approval granted, 3.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Proposed Diesel… — forest land use approved, 5.4 km away
- Proposed Reserve Forest Land To Be Diverted For Construction Of Juhana Link… — lapsed, 5.8 km away
- Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat… — forest land use approved, 6.3 km away
- Proposed Protected Forest Land of Agra Etawah Road NH-19 & Old Mughal Road, to… — lapsed, 6.9 km away
- Proposed PF land to be diverted for Laying CNG pipeline by Torrent Gas Private… — forest land use approved, 7.1 km away
- Ordinary Soil Excavation Project" Gata No.– 461, Village- Kamet, Tehsil-… — environmental approval granted, 7.8 km away
- Proposed protected Forest Land to be diverted for Exit/Entry of New Bharat… — forest land use approved, 8.4 km away
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.