Project details
| Status | Decision issued |
|---|---|
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 1,100 m² |
| Project cost | ₹2 lakh |
| Village / locality | Jamsoti Bandhi |
| Taluk / tehsil | Chakia |
| District | Chandauli |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-07272 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Nov 2023 | Approval revoked | ₹2 lakh | |
| New project filed 24 Aug 2023 (this page) | Decision issued | 0.3 acres | ₹2 lakh |
In context
12 applications in Chandauli since January 2022 are in the same category (Roads & highways): 1 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamsoti Bandhi, Chakia, Chandauli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- OFC Laying along with Chakia to Chandraprabha road, District:- Chandauli… — approval revoked, 50 m away
- Under 4G Saturation Project, underground OFC laying — in-principle approval, conditions pending, 100 m away
- Forest Land for Laying of Underground Optical Fibre Cable — lapsed, 400 m away
- Laying of ADSS Optical Fibre Cable(aerial installation) — lapsed, 1.7 km away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 4.2 km away
- Musakhand Pumped Storage Project (600 MW) — cleared for impact study, 4.3 km away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 4.3 km away
- Musakhand Pumped Storage Project (600 MW) — cleared for impact study, 4.3 km away
More from Bharat Sanchar Nigam Limited in Chandauli
- 4G SATURATION PROJECT MISSION 500_Semaria — decision issued
- 4G SATURATION PROJECT MISSION 500_Hinaut Ghat — decision issued
4 Bharat Sanchar Nigam (BSNL) projects in Chandauli
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.