One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed reserved forest land to be diverted for Construction of Link Road from…
Project details
| Official title | Proposed reserved forest land to be diverted for Construction of Link Road from Khushbubag Nursery to Village Gadaura and Sant Keenaram College, in District:-Sonbhadra |
|---|---|
| Status | More information requested |
| Status since | 9 Apr 2024 |
| Application filed | 9 Apr 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Public Works Department |
| Land area | 9.6 acres (3.9 ha) |
| Project cost | ₹4 crore |
| Village / locality | Lori |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07323 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Aug 2026 | Under forest review | 9.6 acres | ₹4 crore |
| New project filed 9 Apr 2024 (this page) | More information requested | 9.6 acres | ₹4 crore |
In context
8 applications in Sonbhadra since January 2022 are in the same category (Buildings & townships): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lori, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed reserved forest land to be diverted for Construction of Link Road… — under forest review, 0 m away
- Proposed Wildlife Proposal of Reserved Forest Land to be diverted for… — more information requested, 1.9 km away
- Proposed Reserved Forest Land to be Diverted for Construction of Link Road… — lapsed, 1.9 km away
- Khanda, Boulders (Dolostone) Mining Project — environmental approval granted, 2.5 km away
- Retail Outlet of M/s Goal Bio Oil on Varanasi Shaktinagar Road SH 5A at KM 105… — more information requested, 4.6 km away
- Proposed Reserved Forest Land to be diverted for Doubling of CHUNAR-CHOPAN… — lapsed, 4.8 km away
- Laying of Underground Optical Fibre Cable — lapsed, 6.5 km away
- Widening & Stengthenting of kargara to aluwar link road from Ch.00km to ch… — lapsed, 8.6 km away
More from Public Works Department in Sonbhadra
- Proposed reserved forest land to be diverted for New construction of Gram… — more information requested
- Proposed Wildlife Proposal of Reserved Forest Land to be diverted for… — more information requested
- Proposed Reserved Forest Land to be diverted for Construction of Tilhar Link… — more information requested
- Proposed Reserved Forest Land to be diverted for Construction of Tilhar Link… — lapsed
- Proposed Reserved Forest Land to be Diverted for Construction of Link Road… — lapsed
7 Public Works Department, Uttar Pradesh projects in Sonbhadra
All 43 Public Works Department, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.