| Official title | "Ordinary Earth Mine" at Village- Naugawan Urf Navinagar, Gata No.- 45, 51, 56, 58, 60, 72 & 96B, Lease Area- 0.519 Ha., Tehsil- Bisalpur, District- Pilibhit, Uttar Pradesh, Project Proponent- M/s Ram Bahadur Contractor (Authorised Person- Shri Ram Bahadur S/o Shri Ram Chandra Lal) |
|---|---|
| Status | Initial checks |
| Status since | 25 Nov 2026 |
| Application filed | 28 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Bahadur |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Naugawa Urf Navi Nagar |
| Taluk / tehsil | Bisalpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07450 |
In context
19 applications in Pilibhit since January 2022 are in the same category (Mining): 12 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 100% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 6.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Naugawa Urf Navi Nagar, Bisalpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Mining Project" at Gata No. 54, 73, 82, 81, 96Aa, 87,… — environmental approval granted, 100 m away
- Proposed Reserved Forest Land to be diverted for Widening of Bisalpur- Banda-… — lapsed, 6.7 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 7.1 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Reliance… — lapsed, 7.1 km away
- Widening/Upgradation to four lane configuration of Shahjahanpur-Bisalpur… — more information requested, 11 km away
- Bisalpur Section (Design Km. 31.700 to Km. 47.026) of Four Lane of… — more information requested, 11 km away
- Proposed Forest Land to be Diverted for Approach Access to HPCL Retail Outlet… — more information requested, 13.9 km away
- Iradatpur Pagar Soil Mining Project — environmental approval granted, 16.6 km away
More from Ram Bahadur in Pilibhit
- Ordinary Soil Excavation Mining Project" at Gata No. 54, 73, 82, 81, 96Aa, 87,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.