Quick answers
What is this project?
NOC Wildlife Clearance of Proposed 3.3MWac Solar PV Project With Laying of 3.6KM 33KV Transmission Line From Solar Power Plant To Abhaypura Substation At Abhyapura, Under Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Scheme in National Chambal Wild Life Sanctuary (Chambal Wild Life Division), District-Agra, Uttar Pradesh is a proposed power project in Abhaipura, Bah, Agra, Uttar Pradesh. The site covers 13.4 acres.
Who is building it?
The applicant is Clean Power Generation In-2 Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Abhaipura, Bah, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14.9 crore and a site of 13.4 acres.
When was it filed?
The application was filed on 31 Oct 2026.
Project details
| Official title | Proposal For NOC Wildlife Clearance of Proposed 3.3MWac Solar PV Project With Laying of 3.6KM 33KV Transmission Line From Solar Power Plant To Abhaypura Substation At Abhyapura, Under Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Scheme in National Chambal Wild Life Sanctuary (Chambal Wild Life Division), District-Agra, Uttar Pradesh |
|---|---|
| Status | Under wildlife review |
| Status since | 13 Nov 2026 |
| Application filed | 31 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Clean Power Generation In-2 Private Limited |
| Land area | 13.4 acres (5.4 ha) |
| Project cost | ₹14.9 crore |
| Village / locality | Abhaipura |
| Taluk / tehsil | Bah |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07484 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abhaipura, Bah, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended BharatNet Project (Bah-Agra) — lapsed, 3.7 km away
- Regarding permission for non-forestry use of forest land for laying pure… — more information requested, 6 km away
- NOC OF WILDLIFE CLEARANCE FOR THE PROPOSED 0.587 MWp GROUND MOUNTED SOLAR PV… — more information requested, 6.3 km away
- Protected Forest Land to be Diverted for Entry/ Exist and middle approach to… — more information requested, 10.3 km away
- Diversion of 0.2635 Hectare of protected Forest land under Social forestry… — under forest review, 11.3 km away
- The Diversion of Road Side Protected Forest Land on Agra -Bah -Kachaura Ghat… — forest land use approved, 12.1 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under wildlife review, 12.3 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under forest review, 12.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.