One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Green field Project for distillation of Benzene, Toluene, Xylene & Industrial…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Oct 2022 |
| Application filed | 27 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Arosolv Distillates Private Limited |
| Land area | 13.4 acres (5.4 ha) |
| Project cost | ₹14,700 crore |
| Village / locality | Sarbamangola |
| Taluk / tehsil | Pandua |
| District | Hooghly |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-00021 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 May 2024 | Environmental approval granted | 18.6 acres | ₹14,700 crore |
| Early planning filed 27 Oct 2022 (this page) | Cleared for impact study | 13.4 acres | ₹14,700 crore |
In context
20 applications in Hooghly since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 13.4 acres, this one is larger than 50% of them.
Where it is
Sarbamangola, Pandua, Hooghly, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Green field Project for distillation of Benzene, Toluene, Xylene &… — environmental approval granted, 250 m away
- Expansion of Grain based distillery from 285 KLPD (60 KLPD RS/ENA+225 KLPD… — environmental approval granted, 9.6 km away
- Expansion of Grain based distillery from 285 KLPD (60 KLPD RS/ENA+225 KLPD… — cleared for impact study, 9.6 km away
- Expansion of Grain based Distillery from 60 KLPD to 285 KLPD by M/s. Alpine… — environmental approval granted, 9.6 km away
- Residential Complex and Resort Complex — environmental approval granted, 10.6 km away
- Proposed Project Is For Implementation of 36 KLPD Vegetable Wax Refining Plant… — under environmental review, 11.8 km away
- Proposed CNSL/Cardanol Resin Production Plant — environmental approval granted, 12 km away
- Proposed CNSL/Cardanol Resin Production Plant — cleared for impact study, 12 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.